Applications
Bonding
Aluminium and Copper Bonded over Large Area
Over 1,000 mm2 Bonding Area with our 10 kW Double Power System
Point
- Clean metal-to-metal bonding
- No adhesives required
- Bonding at room-temperature and under atmospheric conditions
- Alloy Bonding
- Process time approx. 3~5 s
- No part damage or oxidization
- Minimal anvil and tool heating
Data

Pull Test
Bond strength: 14.6 kN
Bond strength: 14.6 kN
Electrical Contact Resistance: 0.567 μΩ
(Measured by Hitachi, Ltd.)
(Measured by Hitachi, Ltd.)
Double Power System
With probes on both sides of the horn, this system delivers up to 10 kW, twice the output of a standard MZ system. A breakthrough in bonding technology.
With probes on both sides of the horn, this system delivers up to 10 kW, twice the output of a standard MZ system. A breakthrough in bonding technology.